CONTINUING WORK
—
ANNAPOLIS COUNTY: Phinney Bridge, Old Mill Road
Phinney Bridge on Old Mill Road in Wilmot, is closed for maintenance work until Friday, Oct. 27.
A detour is in place.
—
CAPE BRETON REGIONAL MUNICIPALITY: Mira Gut Bridge
The Mira Gut Bridge on Mira Bay Drive is temporarily closed for inspection.
There is a detour route via Brickyard Road and Hornes Road.
—
GUYSBOROUGH COUNTY: Route 316
Route 316, from Coddles Harbour Bridge to Drum Head Wharf Road, is reduced to one lane for upgrades and repairs until Friday, Nov. 17. Traffic lights are in place but delays are expected. Work takes place from 6:30 a.m. to 7 p.m.
—
GUYSBOROUGH COUNTY: Route 316, Goshen
Route 316, from the intersection of Route 276 in Goshen north to the Antigonish-Guysborough county line, has alternating lane closures for paving and patching until Monday, Oct. 23.
Traffic signals and traffic control people are on site. Work takes place from 6:30 a.m. to 7:30 p.m.
—
HALIFAX REGIONAL MUNICIPALITY: Highway 102, Exit 2, Night Work
Highway 102, southbound lanes, from Exit 2 to Bayers Road are reduced to one lane for road repairs until Monday, Oct. 23.
This is for night work only. Work takes place from 7:30 p.m. to 5 a.m.
—
HALIFAX REGIONAL MUNICIPALITY: Highway 103, Hubbards to Ingramport
Highway 103, from the Lunenburg County/Halifax Regional Municipality line, easterly for nine kilometres is reduced to one lane for repaving, shoulder work, gravelling and guardrail work until Tuesday, Oct. 31.
Alternate route is on Exit 5A off Highway 103 at Ingramport, to Trunk 3 (St. Margarets Bay Road) and back to Highway 103 at Exit 6. Work takes place during daytime hours.
—
HALIFAX REGIONAL MUNICIPALITY: Route 333, Prospect Road, Hatchet Lake
The intersection of MacDonald Lake Drive and Route 333 (Prospect Road) in Hatchet Lake has occasional stop-and-go traffic during work to widen and pave the road. Work will continue until Tuesday, Oct. 31.
Drivers should reduce speed and expect delays. Work takes place from sunrise to sunset.
—
HALIFAX REGIONAL MUNICIPALITY: North West Arm Drive
Both southbound lanes on North West Arm Drive are closed during repairs to the bridge over the Chain of Lakes Trail beside First Chain Lake. Traffic is being detoured to the northbound bridge where there is one lane for each direction.
Repairs to both bridges are expected to be completed by Thursday, Nov. 30.
—
HANTS COUNTY: Highway 1
Highway 1 from Avon River Bridge, Windsor, to Holmes Hill Road, Hantsport, is reduced to one lane for road work until Tuesday, Oct. 31.
Work takes place from sunrise to sunset.
—
INVERNESS COUNTY: West Lake Ainslie Road
The Hayes River Bridge on West Lake Ainslie Road has a 15-tonne weight restriction.
—
LUNENBURG COUNTY: Fitch Road, Conquerall Mills
Fitch Road from Conquerall Road to Lake Road, Conquerall Mills, has alternating lane closures for gravelling and grading until Wednesday, Nov. 15.
Work takes place from sunrise to sunset.
—
LUNENBURG COUNTY: Garber Road, Newcombville
Garber Road from Route 210 to Lapland Road, Newcombville, has alternating lane closures for gravelling and grading until Wednesday, Nov. 15.
Work takes place from sunrise to sunset.
—
LUNENBURG COUNTY: Hirtle Road, Lunenburg
Hirtle Road from Route 325, Lunenburg, southerly for 1.6 kilometres has alternating lane closures for gravelling and grading until Wednesday, Nov. 15.
Work takes place from sunrise to sunset.
—
LUNENBURG COUNTY: Lapland Road, west of Bridgewater
Lapland Road, from the intersection of Route 325 south for 6.5 kilometres, has alternating lane closures for resurfacing and upgrades.
Work takes place from sunrise to sunset until Monday, Oct 23.
—
LUNENBURG COUNTY: New Cumberland Road, south of Bridgewater
New Cumberland Road from Lakefield Road to Mount Pleasant, has alternating lane closures for resurfacing and upgrades.
Work takes place from sunrise to sunset until Monday, Oct. 23.
—
LUNENBURG COUNTY: Watermills Road, Lunenburg
Watermills Road from Italy Cross Road to New Cumberland Road, Lunenburg, has alternating lane closures for gravelling and grading until Wednesday, Nov. 15.
Work takes place from sunrise to sunset.
—
YARMOUTH COUNTY: Route 3, Argyle
Route 3, between Exit 32 and Ye Old Argyle Road, is reduced to one lane for paving and construction until Tuesday, Oct. 31.
Drivers should expect delays. Work takes place from sunrise to sunset.
—
YARMOUTH COUNTY: Eel Brook
Eel Brook Lake Bridge on the Eel Brook Lake Road has been closed for repairs with detours on Hwy 103 and Trunk 3 until Friday, Oct. 27.
Source: Release