Location: Southgate Drive from Larry Uteck Boulevard to Windbridge Lane
Time: 9 a.m. to 4 p.m. and 6 to 9 p.m.
Work details: This work is for pavement maintenance. This project supports the 2021-25 Regional Council Strategic Priorities Plan<www.halifax.ca/sites/default/files/documents/city-hall/budget-finances/2021%20StrategicPrioritesPlan_Final.pdf> to establish a safe and accessible integrated mobility network.
Traffic impact: During the 9 a.m. to 4 p.m. work, there will be stop-and-go traffic on Southgate Drive. The work from 6 to 9 p.m. will be in the intersection of Southgate Drive and Larry Uteck Boulevard. During this time the traffic signals will be shut down and traffic control personnel will be in place.
–