Road Closure – Wyse Road
Location: Wyse Road, between Symonds Street and Boland Road
Date: Monday, Oct. 17 at 7 a.m. to Friday, Oct. 28 at 7 p.m.
Work details: This work is to support underground upgrades to storm water and wastewater infrastructure.
Traffic impact: Wyse Road, between Symonds Street and Boland Road, will be closed while work is underway. A signed detour route will be in place. The north sidewalk will remain open. Traffic control personnel will be on-site to direct vehicle and pedestrian traffic.
–
Location: Wyse Road, between Symonds Street and Boland Road
Date: Monday, Oct. 17 at 7 a.m. to Friday, Oct. 28 at 7 p.m.
Work details: This work is to support underground upgrades to storm water and wastewater infrastructure.
Traffic impact: Wyse Road, between Symonds Street and Boland Road, will be closed while work is underway. A signed detour route will be in place. The north sidewalk will remain open. Traffic control personnel will be on-site to direct vehicle and pedestrian traffic.
–