PSA – Road Construction – Larry Uteck Boulevard at Southgate Drive

Road Construction – Larry Uteck Boulevard at Southgate Drive

Location: Intersection of Larry Uteck Boulevard at Southgate Drive
Date: Tuesday, November 1 from 9 a.m. to 1 p.m.

Work details: The work is for paving at the intersection. This project supports the 2021-25 Regional Council Strategic Priorities Plan<www.halifax.ca/sites/default/files/documents/city-hall/budget-finances/2021%20StrategicPrioritesPlan_Final.pdf> to establish a safe and accessible integrated mobility network.
Traffic impact: During this work, the traffic signals will be shut down and traffic control personnel will be in place to direct traffic and pedestrians. Motorists should expect delays and are asked to use alternative routes whenever possible.

UPDATE: PSA – Road Closure – Wyse Road

Thousands of dollars in equipment stolen from fire station