What Is the Construction Timeframe for a Custom House?

The timeline for constructing a custom house differs according to various factors, from design complexity, local zoning regulations, weather, type of materials, and the custom home builder you choose to work with. If you are serious about building a customized home, work with a reliable company that offers an accurate timeframe for such projects.  

Getting Ready for the Construction Process

The construction of a new custom home requires a lot of preparations financially, mentally, and physically. It is a time-consuming process, even for the most experienced professionals. They must develop a project plan, create a budget, obtain permits, choose suitable materials, and handle all other details. It also requires patience and dedication as you allow the experts to tackle the job. 

After the land acquisition, the building process takes the following turn of events:

  1. Design and planning (6 weeks to 3 months)
  2. Local regulation compliance and permissions (at least two months)
  3. Prepping the site
  4. Building the foundation
  5. Constructing walls, framing, and roofing
  6. Completing the electrical and plumbing work
  7. Finishing- decking, painting, and more

Generally, here are the expected timelines that qualified contractors need to complete different custom homes. 

  • Prefabricated construction of an average house: At least six months (extra remodeling prolongs the timeline)
  • Single-family unit with advanced features like fireplaces and decks: At least one year
  • Two-story custom house: More than a year 

Factors Affecting the Timeline

It will help if you discuss the timeline with the builder as early as possible. However, contractors only give a more accurate timeline once they start the project and after inspections and acquiring all the essential documentation. Here’s a rundown of the critical factors determining the time needed to build a custom house.

Zoning Laws and Regulations

A home builder must submit a custom home plan compliant with the local building codes and other requirements to obtain the building permits. When the authorities approve the application, then the construction process can start.

Home Size

The timeframe is highly dependent on the size of your desired home. The larger the footage, the more time is needed to demolish existing structures and prep the site. The same applies when laying the foundation, roofing, framing, building walls, installing windows and doors, installing plumbing, electrical wiring, and finishing. This can take between four and six months or more.

Weather

The climatic conditions can cause significant delays, increasing the timeline needed to complete a custom-built home. A report published by MacSphere shows that there are no reliable insurance policies for construction companies to cover potential losses caused by bad weather in Canada. Custom home builders are forced to postpone operations when bad weather strikes, e.g., flooding, snowstorm, thunderstorm, high winds, heatwaves, and heavy rainfall. 

Availability of Labour

A lack of human resources can also affect the progress of building a custom house. To ensure that the timeline is not extended, experienced builders plan for labor well in advance. That is why consulting a professional company well-connected to the workforce is crucial.

What Next?

Hiring a professional custom home contractor is the best way to manage your project from start to finish without unnecessary delays or excuses. Find a contractor well-versed with zoning regulations, local building codes, and home designs so they can complete it safely and efficiently. A seasoned builder can spot potential problems earlier and solve them in good time. Get in touch today to get started and have your new home completed in record time. 