Road Construction – Larry Uteck Boulevard
Location: Larry Uteck Boulevard at the intersection of Brookline Drive (north) and Broad Street (north)
Dates: Tuesday, February 21 to Friday, March 10 Friday, March 31
Time: Weekdays from 9 a.m. to 4 p.m.
Work details: This work is related to the construction of a new roundabout<www.halifax.ca/home/news/road-construction-larry-uteck-boulevard-7> at the intersection of Larry Uteck Boulevard, Brookline Drive and Broad Street.
Traffic impact: Stop-and-go traffic will be in place while work is underway. Pedestrian access will be provided around the construction site with the assistance of traffic control personnel. Motorists should expect delays and are asked to use alternative routes during this period. Altered centerlines will be in place outside of these hours.
–
Location: Larry Uteck Boulevard at the intersection of Brookline Drive (north) and Broad Street (north)
Dates: Tuesday, February 21 to Friday, March 10 Friday, March 31
Time: Weekdays from 9 a.m. to 4 p.m.
Work details: This work is related to the construction of a new roundabout<www.halifax.ca/home/news/road-construction-larry-uteck-boulevard-7> at the intersection of Larry Uteck Boulevard, Brookline Drive and Broad Street.
Traffic impact: Stop-and-go traffic will be in place while work is underway. Pedestrian access will be provided around the construction site with the assistance of traffic control personnel. Motorists should expect delays and are asked to use alternative routes during this period. Altered centerlines will be in place outside of these hours.
–