PSA – Trail Construction – McIntosh Run Trail

Trail Construction – McIntosh Run Trail Location: McIntosh Run Trail off of Honeygold Drive Dates: Thursday, Feb. 29 to Thursday, March 14 Time: 8 a.m. to 5 p.m. (weekdays only) Work details: The work includes placing gravels and trail widening along with some tree trimming. All construction activities will be confined to the trail. Signage will be installed and pedestrian traffic control measures will be implemented to inform residents.

Halifax Water PSA – Water Service & Traffic Advisory – Memorial Drive – Water Main Repair

Halifax Water PSA – Water Service & Traffic Advisory – Newbery Street – Water Main Repair