Halifax Water PSA – Traffic Advisory – Chebucto Road and Armdale Rotary

Traffic Advisory – Chebucto Road and Armdale Rotary

(September 23, 2024) Halifax Water would like to advise of road and lane closures impacting portions of Chebucto Road and the Armdale Rotary beginning on Thursday, September 26, at 7:00 PM and continuing to Friday, September 27 at 6:00 AM.
During this period, Harbour Construction will be conducting a water main replacement on Chebucto Road.
As a result, the Armdale Rotary will be reduced to one lane, and access to that section of Chebucto Road will be closed. The area between the Armdale Rotary and MacDonald Street will be limited to local traffic only. See the attached map for further details.
Experienced traffic control personnel will be on-site to manage traffic flows. Sidewalks in the work zone will be closed.
Motorists should expect delays and use alternate routes. Motorists are also reminded that speed fines double in work zones.
Recommended detours:
· To access Mumford Road Shopping / Halifax Shopping Centre
o From the Armdale Rotary take the Quinpool Road exit, turn onto MacDonald Street
o From the Armdale Rotary take the Joesph Howe Drive exit onto Mumford Road
This work is part of the Quinpool Road Water Main Replacement Capital Project, learn more about this project at halifaxwater.ca/project/quinpool-road-watermain-replacement

To ensure the safety of our communities and our staff, please maintain a safe distance when Halifax Water staff or contractors are working in your area.

For more information on Halifax Water, please check www.halifaxwater.ca<www.halifaxwater.ca/#_blank>, visit us on YouTube, or Twitter @HalifaxWater, Facebook, or call our Customer Care Centre at 902-420-9287.

It begins: HRM residents will receive voter info and ID numbers in early October