PSA – Traffic Delay – Larry Uteck Boulevard

Traffic Delay – Larry Uteck Boulevard
Location: Larry Uteck Boulevard between Bluewater Road and Blue Mountain Drive
Date: Thursday, Oct. 31 to Friday, Nov. 15 (weekdays only)
Time: 9 a.m. to 4 p.m.
Work details: This work is required for gas main installation and road repairs.
Traffic impact: One-way traffic will be maintained while work is underway. Motorists should expect delays and are asked to use alternative routes whenever possible.

Halifax Water PSA – Traffic Advisory – Bedford Highway – Stormwater System Maintenance

PSA – Traffic Delay – Robie Street