Whether commuting within the HRM or heading out of town, drivers should anticipate delays and detours as several infrastructure projects are currently underway or scheduled to begin shortly.
Halifax Regional Municipality
Map location is approximate and may not reflect the exact location.
Sackville Drive — Beaver Bank Road to Florence Street
- Work expected to begin in the coming weeks and finish in fall 2026.
- Weekday work: 7 a.m. to 4 p.m. with a lane reduction.
- Weeknight work: 6 p.m. to 7 a.m. with an altered centreline.
- Two-way traffic and local, business, and emergency access maintained throughout.
- Sidewalk sections temporarily closed with marked detours in place.
- Transit stops face short-term closures; pedestrian access to the Sackville Greenway Trail and Sackville Public Library maintained.
Halifax Regional Municipality
Map location is approximate and may not reflect the exact location.
Nantucket Avenue — Wyse Road to Victoria Road
- Road maintenance and repaving begins mid-July, anticipated completion September 2026.
- Weeknight work: 7 p.m. to 6 a.m. with lane reductions and occasional stop-and-go traffic.
- Weekend work may occur 8 a.m. to 7 p.m. to minimize daytime impacts.
- Sidewalks and bus access to the Bridge Terminal remain open.
- Access to the Macdonald Bridge and Zatzman Sportsplex maintained at all times.
Provincial Highway Work — Nova Scotia
Map location is approximate and may not reflect the exact location.
Highway 103 Twinning — Hubbards to Chester
- Temporary lane closures for blasting continue until May 2027, between 2 km west of Exit 6 and 4 km west of Exit 7.
- Blasting occurs most weekdays around 10 a.m. and 2 p.m., lasting approximately 10 minutes.
- Both eastbound and westbound lanes close during blasting intervals.
- No blasting on weekends, holidays, days before holidays, or Fridays after 12 p.m.
Provincial Highway Work — Nova Scotia
Map location is approximate and may not reflect the exact location.
Campbell Brook Bridge — Keltic Drive, Sydney
- Bridge closed 24/7 for full replacement until July 31, 2026.
- Detour: Route 305 → Northwest Arm Road → Route 239 → Route 305.
Regional Notice — Prince Edward Island
Map location is approximate and may not reflect the exact location.
Brothers Road — Summerville, PEI
- A portion of Brothers Road is closed for construction until approximately July 22, 2026.
- Closure begins 500 metres north of Route 3 and extends north approximately 1 kilometre.
- Drivers must use alternate routes and expect delays.
Haligonia is not a media outlet, and we do not employ journalists. While every effort has been made to ensure accuracy, this post is for informational purposes only. This post was aided using AI tools.