Bluenose Steering Work underway

As announced earlier this month, installation of a hydraulic steering gear is underway aboard the bluenose. She is currently tied up next to the fisheries museum’s Wharf.

Woodside 1 on the Slip in Lunenburg

Natural Gas Pipeline Installation – Barrington Street