Downtown Halifax detours for routes 2, 4, 185, 330 between October 27 and November 7

Construction in downtown Halifax, on the lower Cogswell St. ramp that leads to Barrington St. north (outbound), will begin Tuesday October 27 and will last until Saturday November 7.

During this time Halifax Metro Transit bus routes 2, 4, 185, 330 will rerouted as follows:

  • Route 330 (to Tantallon) will depart Albemarle (was Market St.), turn right on Cogswell St., right on Barrington St., right on Duke St., onto Rainnie Dr., then right on Gottingen St., continuing down Gottingen St, resuming regular routing at North St.
  • Routes 2 (to Wedgewood), 4 (to Farnham Gate), and 185 (to Sackville) will travel via Duke St., to Rainnie Dr., right on Gottingen St., right on Cornwallis St., left on Barrington St., to resume regular routing.


Monday morning session. Photo by Chris Helland

Photo of the Day: Monday morning session

Slow Cooked Apple Sauce & Amazing Grass Surprise