Menu

Halifax Water PSA – North West Arm (Chebucto Road) – Wastewater System Repair



North West Arm (Chebucto Road) – Wastewater System Repair

(October 5, 2024) Halifax Water is currently onsite near 7156 Chebucto Road, Halifax performing a critical infrastructure repair to the wastewater pipe.

Until further notice, Halifax Water is asking all residents in the area of the map attached, to reduce wastewater flows to reduce pressure on the wastewater system and minimize environmental impacts during this repair. Please minimize use of running water, flushing toilets or doing laundry during this time.

To learn more, visit halifaxwater.ca/reducing-wastewater<www.halifaxwater.ca/reducing-wastewater>. 

 Traffic routes were already modified for watermain work in the area for the weekend, it is anticipated that additional lane closures may be required. See here for current traffic control. Please use caution when driving in the area.

We appreciate your assistance in this matter and apologize for any inconvenience this wastewater system repair may cause. 

To ensure the safety of our communities and our staff, please maintain a safe distance when Halifax Water staff or contractors are working in your area. 

For more information on Halifax Water, please check www.halifaxwater.ca<www.halifaxwater.ca/#_blank>, visit us on YouTube, or Twitter @HalifaxWater, Facebook, or call our Customer Care Centre at 902-420-9287.  

Exit mobile version