Halifax Water PSA – Pedestrian Traffic Advisory – Walking path behind Boling Green Crescent – Wastewater System Maintenance

Pedestrian Traffic Advisory – Walking path behind Boling Green Crescent – Wastewater System Maintenance
(November 1, 2024) From 9:00 AM to 3:00 PM on Monday, November 4, Halifax Water crews will be on-site performing stormwater system maintenance near the walking path behind 82 Boling Green Crescent, Cole Harbour. The walking path between Attwood Crescent and Colby Drive may be partially or fully blocked, with equipment behind 82 Boling Green Crescent. Experienced personnel will be on-site to ensure local walking path users can safely bypass work areas. We apologize for any inconvenience this necessary infrastructure repair work may cause.
To ensure the safety of our communities and our staff, please maintain a safe distance when Halifax Water staff or contractors are working in your area.
For more information on Halifax Water, please check www.halifaxwater.ca<www.halifaxwater.ca#_blank>, visit us on YouTube, or Twitter @HalifaxWater, Facebook, or call our Customer Care Centre at 902-420-9287. –

PSA – Traffic Delay – Princess Margaret Boulevard

Halifax Water PSA – Traffic Advisory – Sackville Drive – Stormwater System Maintenance