Halifax Water PSA – Traffic Advisory – Meadowbrook Drive – Stormwater System Maintenance

Traffic Advisory – Meadowbrook Drive – Stormwater System Maintenance
(May 19, 2022) Halifax Water crews are on site performing stormwater system maintenance on Meadowbrook Drive, Bedford. This work is being done from the top pf Meadowbrook Drive down to the Bedford Highway and is expected to continue until 11:00 PM.
This work will not impact Halifax Water services in the area..
There is stop-and-go traffic in the work zone. Experienced traffic control personnel will be on-site to manage traffic flows. Motorists should expect delays and use alternate routes. Motorists are also reminded that speed fines double in work zones. We apologize for any inconvenience this necessary infrastructure repair work may cause. To ensure the safety of our communities and our staff, please maintain a safe distance when Halifax Water staff or contractors are working in your area. For more information on Halifax Water, please check www.halifaxwater.ca<www.halifaxwater.ca#_blank>, visit us on YouTube, or Twitter @HalifaxWater, Facebook, or call our Customer Care Centre at 902-420-9287. –

Over $20,000 in materials stolen from residential construction sites

UPDATE: PSA – Road Construction – Mount Edward Road