Menu

Herring Cove Road and Williams Lake Road – Natural Gas Installation

Thursday, September 22, 2016 (Halifax, NS) – The Halifax Regional Municipality is advising residents and motorists of a natural gas installation on Herring Cove Road at the intersection of Williams Lake Road, and on Williams Lake Road between Herring Cove Road and Civic Number 6 beginning Friday, September 23 and continuing Monday, September 26 through Wednesday, September 28.

Two-way traffic will be maintained on Herring Cove Road during peak hours of 7 a.m. to 9 a.m. and 4 p.m. to 6 p.m.  Stop-and-go traffic will occur as needed on Herring Cove Road and Williams Lake Road between 9 a.m. and 4 p.m. Pedestrians will be directed around the work site as required.

Heritage Gas will be installing a natural gas main extension during these times. The municipality and Heritage Gas regret any inconvenience this work may cause.

Source: Release

Exit mobile version