CONTINUING WORK
—
COLCHESTER/CUMBERLAND: Highway 104
Traffic on sections of the eastbound lanes of Highway 104, from west of Exit 8 at Westchester to the Mines Bass River Road underpass, are reduced to one lane for guardrail repairs and repaving until Monday, Aug. 31.
Traffic control people are on site. Work takes place from 6:30 a.m. to 8:30 p.m.
—
COLCHESTER, HANTS COUNTIES: Highway 102, Shubenacadie River
Construction on Highway 102, at the bridges over the Shubenacadie River, continues until September.
Traffic is moving in both directions, but drivers are urged to travel with extra caution in the area.
—
CUMBERLAND COUNTY: Eddy Road
Eddy Road to Fort Lawrence, near Amherst, is closed until further notice because of a collapsed culvert.
—
DIGBY COUNTY: Melanson Mills Bridge
Melanson Mills Bridge on Marc Comeau Road is closed until further notice to replace the deck.
A detour route is in place.
—
HALIFAX REGIONAL MUNICIPALITY: Highway 102, Night Work
Sections of the Halifax-bound lanes of Highway 102, between Exit 5 at Fall River and Exit 4-C at Glendale Avenue and Duke Street, are reduced to one lane during night hours.
On weekdays, lane reductions begin at 7 p.m. and end at 6 a.m. On weekends, the lane reductions are from 7 p.m. until 7 a.m.
Delays are possible during construction. Travel with caution and use an alternate route if possible. Work will be completed this fall.
—
HALIFAX REGIONAL MUNICIPALITY: Highway 118, Fall River
The Highway 118 overpass over Perrin Drive in Fall River is reduced to one lane in each direction during repairs until Monday, June 15.
Two lanes are open during peak hours. For inbound lanes, it is 6 a.m. to 9 a.m. Monday to Friday, and 3 p.m. to 7 p.m. Monday to Friday, for outbound lanes.
—
HANTS COUNTY: Clayton McKay Road
The Clayton McKay Road, near Smiley’s Provincial Park, will be closed until Sunday, June 28, to replace the bridge.
Detour signs will be posted. Access to the park will not be affected.
—
HANTS/COLCHESTER COUNTY: Meadow Road
Meadow Road, from Cooks Brook Road to Route 224, will be down to one lane for asphalt and concrete patching and paving. This will require reduced speed and may require vehicles to stop. The work, from sunrise to sunset, is expected to be finished by Wednesday, Sept. 30.
—
HANTS/COLCHESTER COUNTY: Whittenburg Road
Whittenburg Road in Lower Stewiacke, from Route 224 north to the Colchester County line for about four kilometres, will be down to one lane for asphalt and concrete patching and paving. This will require reduced speed and may require vehicles to stop. The work, from sunrise to sunset, is expected to be finished by Wednesday, Sept. 30.
—
INVERNESS COUNTY: Crowdis Bridge
Crowdis Bridge is closed until further notice for repairs. A detour is available via Crowdis Cross, West Big Intervale, and Hatchery roads.
—
INVERNESS COUNTY: Trunk 19
Trunk 19, from about five kilometres north of the Port Hastings Rotary at Creignish, north for 6.5 kilometres, will be reduced to one lane for patching and paving until Friday, July 31.
Traffic control people and a pilot vehicle will be on site. Work takes place from 6 a.m. to 8 p.m.
—
INVERNESS COUNTY: West Lake Ainslie Road
The Hayes River Bridge on West Lake Ainslie Road has a 15-tonne weight restriction.
—
KINGS COUNTY: Whitman Bridge
Whitman Bridge, on Whitman Road between Maple Avenue and Ward Road in Aylesford, is closed for repairs until further notice.
The detour route is Maple Avenue to Victoria Road to Ward Road.
—
LUNENBURG COUNTY: Old Town Bridge, Bridgewater
The Old Town Bridge on Trunk 3 over the LaHave River will be closed to all traffic until June 12 for repairs.
Traffic will be detoured via the Veterans Memorial Bridge.
—
LUNENBURG COUNTY: Route 332
Route 332, from Trunk 3 towards Riverport for about eight kilometres, will have alternating one-lane closures for paving until Wednesday, Sept. 30.
Traffic control will have stop and go traffic. Work takes place from sunrise to sunset.
—
LUNENBURG COUNTY: Varner Bridge
Work has begun on a new bridge beside the existing Varner Bridge on Route 208 near New Germany. The bridge is open during construction, but there may be occasional, brief closures during construction. Drivers should use extra caution in the area.
The new two-lane bridge will be completed this year.
—
PICTOU COUNTY: Fraser’s Mountain Branch Road
Fraser’s Mountain Branch Road, from Fraser’s Mountain Road to Glenfallach Road for about three kilometres, will periodically be reduced to one lane for gravelling and seal coating until Monday, Aug. 31.
Traffic control people will be on site. Work takes place from 6 a.m. to 6 p.m.
—
PICTOU COUNTY: Glenfallach Road
Glenfallach Road, from Woodburn Road to Fraser’s Mountain Branch Road, for almost one kilometre, will periodically be reduced to one lane for gravelling and seal coating until Monday, Aug. 31.
Traffic control people will be on site. Work takes place from 6 a.m. to 6 p.m.
—
PICTOU COUNTY: River John Road
River John Road, from Meadowville Station Road to Scotch Hill Road, will periodically be reduced to one lane for asphalt patching and paving until Monday, Aug. 31.
Traffic control people will be on site. Work takes place from 6 a.m. to 6 p.m.
—
PICTOU COUNTY: Scotch Hill Road
Scotch Hill Road, from Route 376 northerly to River John Road, will be periodically reduced to one lane for asphalt patching and paving until Monday, Aug. 31.
Traffic control people will be on site. Work takes place from 6 a.m. to 6 p.m.
—
PICTOU COUNTY: Springville Bridge
Springville Bridge on Springville Road will be closed until further notice. Detour on East River West Side Road and Route 348.
—
PICTOU/COLCHESTER COUNTY: Route 289
Route 289 from Pictou/Colchester County line, west for almost six kilometres, will be down to one lane for asphalt and concrete patching and paving. This will require reduced speed and may require vehicles to stop. The work, from sunrise to sunset, is expected to be finished by Wednesday, Sept. 30. A flag person will be on site.
—
VICTORIA COUNTY: Gillis Bridge
Gillis Bridge, on North Branch Road, just past Uisge Bàn (USH-KA BAN) Falls Provincial Park, is closed until further notice. Access to the park is not affected.
Source: Provincial Release