PSA – Night Time Road Construction – Larry Uteck Boulevard

Night Time Road Construction – Larry Uteck Boulevard
Location: Larry Uteck Boulevard, at the intersection with Broad Street (south)
Date: Monday, Nov. 8 to Friday, Dec. 24

Time: Weekdays from 7 p.m. each evening until 7 a.m. the following morning

Work details: This work is related to the construction of a roundabout<www.halifax.ca/home/news/road-construction-larry-uteck-boulevard-5> at the intersection of Larry Uteck Boulevard and Broad Street (south).
Traffic impact: Through traffic on Larry Uteck Boulevard will be reduced to one lane, with stop and go traffic while work is underway. Closures remain on Broad Street (south)<www.halifax.ca/home/news/road-closure-broad-street-south> and Brookline Drive<www.halifax.ca/home/news/road-closure-brookline-drive> during this period. Motorists should expect delays and are asked to use alternative routes during this period.

40 new COVID-19 cases, 31 recoveries (Nov 5 2021)

Halifax Water PSA – Traffic Advisory – Westbrook Avenue – Wastewater System Maintenance