Location: Wyse Road, between Symonds Street and Boland Road
Date: Monday, November 7 until Monday, November 21
Time: Closed for 24 hours a day
Work details: This work is to support underground upgrades to stormwater and wastewater infrastructure.
Traffic impact: Wyse Road, between Symonds Street and Boland Road, will be closed while work is underway. A signed detour route will be in place. Local access to the excavation limits will be maintained, with traffic control personnel on site to assist vehicle, bicycle and pedestrian traffic. Motorists should expect delays in the area and are asked to take alternative routes where possible.
–