Road Construction – Hollis Street
Location: Hollis Street, between Cogswell and Duke streets
Date: Monday, Aug. 8 to Friday, Aug. 12
Time: 7 a.m. to 7 p.m. each day (additional evening hours may be required as necessary)
Work details: Traffic delays will be in place to facilitate the installation of emergency water sprinklers
Traffic impact: Hollis Street, between Cogswell and Duke streets, will be reduced to one lane of traffic while work is underway.
The bike lane will be closed from Monday, Aug. 8 to Wednesday, Aug. 10, while the work site is active.
At least one side of the sidewalk will remain open at all times. Marked pedestrian detours will be in place as required.
Motorists can expect delays in the area and are asked to take alternative routes where possible.
–
Location: Hollis Street, between Cogswell and Duke streets
Date: Monday, Aug. 8 to Friday, Aug. 12
Time: 7 a.m. to 7 p.m. each day (additional evening hours may be required as necessary)
Work details: Traffic delays will be in place to facilitate the installation of emergency water sprinklers
Traffic impact: Hollis Street, between Cogswell and Duke streets, will be reduced to one lane of traffic while work is underway.
The bike lane will be closed from Monday, Aug. 8 to Wednesday, Aug. 10, while the work site is active.
At least one side of the sidewalk will remain open at all times. Marked pedestrian detours will be in place as required.
Motorists can expect delays in the area and are asked to take alternative routes where possible.
–