PSA – Road Construction – Main Street

Road Construction – Main Street

Location: Main Street and Cherry Brook Road

Time: 3-6 p.m.

Work details: This work is to urgently replace a damaged pole with attached signage.
Traffic impact: Lane drops will be in place while work is underway. It is anticipated that one inbound and one outbound lane will be closed for the duration. Traffic control personnel will direct motorists, pedestrians, and cyclists. Residents should expect delays and are advised to use alternative routes whenever possible.

PSA – Road Construction – Larry Uteck Boulevard

Halifax Water PSA – Traffic Advisory – Elm Street – Water Valve Repair