PSA – Traffic Delay – Beaver Bank Road

Traffic Delay – Beaver Bank Road

Location: Beaver Bank Road, at the intersection of Millwood and Stokil drives

Time: 9 a.m. to 4 p.m.

Work details: This work is related to installation of new traffic signals. This project supports the 2021-25 Regional Council Strategic Priorities Plan<www.halifax.ca/sites/default/files/documents/city-hall/budget-finances/2021%20StrategicPrioritesPlan_Final.pdf> to establish a safe and accessible integrated mobility network.

Traffic impact: During this work the traffic signals will be shut down and stop-and-go traffic will be in place. Traffic control personnel will be in place to direct traffic and pedestrians. Motorists should expect delays and are asked to use alternative routes whenever possible.

UPDATE Halifax Water PSA: Traffic Advisory – Caldwell Road – Wastewater System Repairs

Halifax Water PSA – Water Service Advisory – Downtown Halifax – Potential for Discoloured Water