Road Construction – Larry Uteck Boulevard
Location: Larry Uteck Boulevard at the intersection of Brookline Drive (north) and Broad Street (north)
Dates: Tuesday, April 26 to Thursday, June 29 Friday, July 28
Time: Weekdays from 9 a.m. to 4 p.m.
Work details: This work is related to the construction of a new roundabout<www.halifax.ca/home/news/road-construction-larry-uteck-boulevard-7> at the intersection of Larry Uteck Boulevard, Brookline Drive (north) and Broad Street (north).
Traffic impacts: Altered centre lines and lane reductions will be required at times. Pedestrian and cyclist access will remain open. Motorists should expect delays and are asked to use alternative routes whenever possible. –
Location: Larry Uteck Boulevard at the intersection of Brookline Drive (north) and Broad Street (north)
Dates: Tuesday, April 26 to Thursday, June 29 Friday, July 28
Time: Weekdays from 9 a.m. to 4 p.m.
Work details: This work is related to the construction of a new roundabout<www.halifax.ca/home/news/road-construction-larry-uteck-boulevard-7> at the intersection of Larry Uteck Boulevard, Brookline Drive (north) and Broad Street (north).
Traffic impacts: Altered centre lines and lane reductions will be required at times. Pedestrian and cyclist access will remain open. Motorists should expect delays and are asked to use alternative routes whenever possible. –