Traffic Delay – Hammonds Plains Road
Location: Hammonds Plains Road, from Pockwock Road to Stillwater Lake Drive Date: Friday, Sept. 13 and Monday, Sept. 16
Time: 9 a.m. to 4 p.m.
Work details: This is to facilitate gravel shoulder regrading.
Traffic impact: Two-way traffic will be maintained with an altered centreline in place. Motorists should expect delays and are asked to use alternative routes where possible.
Location: Hammonds Plains Road, from Pockwock Road to Stillwater Lake Drive Date: Friday, Sept. 13 and Monday, Sept. 16
Time: 9 a.m. to 4 p.m.
Work details: This is to facilitate gravel shoulder regrading.
Traffic impact: Two-way traffic will be maintained with an altered centreline in place. Motorists should expect delays and are asked to use alternative routes where possible.
–