Williams Lake Road – Road Construction

Tuesday, Oct. 4, 2016 (Halifax, NS) – Halifax Regional Municipality is advising residents and motorists construction will take place on Williams Lake Road at Herring Cove Road today and tomorrow (Wednesday). Heritage Gas will be reinstating permanent asphalt through the intersection. Two-way traffic will be maintained on Herring Cove Road between 7 a.m. and 9 a.m., and between 4p.m. and 6 p.m. At least one lane of traffic will be maintained at all other times. Pedestrians will be directed around the worksite as needed. The municipality and Heritage Gas apologize in advance for any inconvenience this work may cause. Source: Release

Tuesday, Oct. 4, 2016 (Halifax, NS) – Halifax Regional Municipality is advising residents and motorists construction will take place on Williams Lake Road at Herring Cove Road today and tomorrow (Wednesday).

Heritage Gas will be reinstating permanent asphalt through the intersection. Two-way traffic will be maintained on Herring Cove Road between 7 a.m. and 9 a.m., and between 4p.m. and 6 p.m. At least one lane of traffic will be maintained at all other times. Pedestrians will be directed around the worksite as needed.

The municipality and Heritage Gas apologize in advance for any inconvenience this work may cause.

Source: Release

The Nova Centre, The Roy, and The Maple. #Halifax              …

Finlay Drive – Continuing Road Construction