Cunard Roundabout – Overhead Utility Work

Friday, April 22, 2016 (Halifax, NS) – The Halifax Regional Municipality is advising residents and motorists to expect traffic delays at the Cunard Street roundabout on Sunday, April 24.  Nova Scotia Power will be on-site working on overhead utility lines at the roundabout from approximately 8 a.m. to 8 p.m. Traffic will be stopped for five to ten minutes at all roundabout entrances from time-to-time throughout the day. Pedestrians will be directed around the work site as needed. Motorists should use an alternative route, if possible.   The municipality regrets any inconvenience this work may cause.Source: Release

Friday, April 22, 2016 (Halifax, NS) – The Halifax Regional Municipality is advising residents and motorists to expect traffic delays at the Cunard Street roundabout on Sunday, April 24. 

Nova Scotia Power will be on-site working on overhead utility lines at the roundabout from approximately 8 a.m. to 8 p.m.

Traffic will be stopped for five to ten minutes at all roundabout entrances from time-to-time throughout the day. Pedestrians will be directed around the work site as needed. Motorists should use an alternative route, if possible.  

The municipality regrets any inconvenience this work may cause.

Source: Release

Power Tool Battery Sparks Fire at Irving Shipyard

Lifting of Spring Weight Restrictions