Halifax Water PSA – Traffic Advisory – Fall River Road – Wastewater System Maintenance

Traffic Advisory – Fall River Road – Wastewater System Maintenance

(February 8, 2024) Halifax Water crews are on-site performing wastewater system maintenance near 1479 Fall River Road, Fall River. This work will not impact Halifax Water services in the area.

There is stop-and-go traffic in the work zone. Experienced traffic control personnel will be on-site to manage traffic flows. Sidewalks remain open.

Motorists should expect delays and use alternate routes. Motorists are also reminded that speed fines double in work zones.

We apologize for any inconvenience this necessary infrastructure repair work may cause.

To ensure the safety of our communities and our staff, please maintain a safe distance when Halifax Water staff or contractors are working in your area.

For more information on Halifax Water, please check www.halifaxwater.ca<www.halifaxwater.ca/#_blank>, visit us on YouTube, or Twitter @HalifaxWater, Facebook, or call our Customer Care Centre at 902-420-9287.

Halifax Water PSA – Traffic Advisory – Kingfisher Way – Wastewater Infrastructure Upgrades

Driving tests sooner: Province hiring more driver examiners