Ketch Harbour Road work

Halifax Water is continuing work to replace a culvert near 31 Ketch Harbour Road in Herring Cove.

Ketch Harbour Road will reopen to full traffic flow tonight at 9pm. Beginning Monday, November 9 at 8:00am, work will resume near 31 Ketch Harbour Road and continue until 4:00pm. There will be stop and go traffic in the work zone.

Experienced traffic control personnel will be on-site to ensure smooth traffic flow. On-site personnel will also maintain communication with local residents and businesses to help minimize disruption. Motorists are asked to use alternate routes and expect delays. Motorists are also reminded that speed fines double in work zones.

There will be no loss of water, wastewater or stormwater services.

For the safety of work crews and residents, please maintain social/physical distancing requirements of at least 2 metres/6 feet.

We apologize for any inconvenience this necessary infrastructure improvement work may cause.

For more information on Halifax Water, please check www.halifaxwater.ca, visit us on YouTube, or Twitter @HalifaxWater, Facebook, or call our Customer Care Centre at 902-420-9287.

Source: Release

Potential COVID-19 exposures at six locations in HRM

Injuries, charges after drunk driving incident