PSA – Road Construction – Southgate Drive

Road Construction – Southgate Drive
Location: Southgate Drive from Larry Uteck Boulevard to Windbridge Lane

Time: 9 a.m. to 4 p.m. and 6 to 9 p.m.
Work details: This work is for pavement maintenance. This project supports the 2021-25 Regional Council Strategic Priorities Plan<www.halifax.ca/sites/default/files/documents/city-hall/budget-finances/2021%20StrategicPrioritesPlan_Final.pdf> to establish a safe and accessible integrated mobility network.
Traffic impact: During the 9 a.m. to 4 p.m. work, there will be stop-and-go traffic on Southgate Drive. The work from 6 to 9 p.m. will be in the intersection of Southgate Drive and Larry Uteck Boulevard. During this time the traffic signals will be shut down and traffic control personnel will be in place.

Provincial Commemorative Service for Queen Elizabeth II

Halifax Water PSA – Traffic & Water Service Advisory – Upper Water Street – Water System Maintenance